September 3, 2019This depends on a few different things. If there is a deposit required, the deposit must be sent
prior to scheduling, as well as a signed contract. If it is a shingle roof removal and replacement, we need to know the color the client has chosen for their new roof prior to ordering material. If the material is special order, that could also cause some delay. Lastly, the weather can prevent us from working. If there is bad weather it can push our schedule back, as we schedule on a “first come, First Serve” basis. The average timing to schedule projects once all information has been provided is approximately 2 to 4 weeks.